REURASIAManagement Corporation

Services

Four ways to start, in the order we recommend them. The smallest step that produces a number you can decide on is usually the right first one.

  1. 01

    Energy and waste audits

    A paid, scoped audit of your waste streams, boilers and energy bills. Deliverable: a report with measured quantities, a costed option comparison and a recommendation, including "do nothing" when that is the answer.

  2. 02

    Operations and maintenance

    Operation, maintenance and annual shutdown of biomass, biogas and waste-to-energy plants under multi-year contracts with availability targets. Reference: 18 TPH biomass boiler, BECIS, Cabuyao, since 2025.

  3. 03

    Containerised biogas digester leasing

    A containerised anaerobic digester financed, built and operated by REURASIA on your site under a 10-year lease. You supply the waste and take the gas or power; the capital cost stays with us. Preferred minimum about 2,000 t/yr of digestible organic waste.

  4. 04

    EPC and project development

    Feasibility, permitting (DOE, ERC, DENR, BOI, NGCP), engineering, procurement and construction management of biomass and waste-to-energy plants, in the Philippines, with our own site teams.

1. ScreenMarket, feedstock, siteand client painvalidation2. StructureBusiness model, grid orofftake logic, permits,stakeholders3. EngineerBasic design, technicalassumptions, EPCinterface4. ProcureSupplier selection,local quotation,importation, sourcing5. DeliverConstructioncoordination, QA/QC,commissioning support6. OperateO&M, audits,optimisation, reporting,training
Support across the project lifecycle, from first screening to operating reality. A paid audit can end at Screen, with a recommendation not to build.

Tell us about your site

What the site produces, what you pay to dispose of it, and what you pay for energy. An engineer reads it and comes back with the first step.