An engineering company with its own plants to show for it. Founded in 2016 by the team whose biomass EPC record carried into the new company.
Company overview
REURASIA was created in 2016 as a joint venture between Full Advantage Philippines Incorporated, a local developer, and former engineers of AREVA Bioenergy. That team of 54 engineers had built biomass power plants across India, Thailand and the Philippines, and its EPC record carried into the new company.
Founded in 2016 by Maxime Droit and Carla Abesamis, the company set out to do in the Philippines what its engineers had done across Asia: engineer, build and operate plants that turn biomass and organic waste into electricity, gas and heat for industry.
From the Philippines, the group opened in France and India in 2020, and has worked as a consultant for the European Union and the Philippine Department of Energy. Selected assignments have taken the team to Europe, India and West Africa; the Philippines is where we build and operate.
REURASIA runs on its own integrated management system: one platform for people, projects, purchasing, quality, safety and documents, built on the ISO 9001 and ISO 14001 way of working.
Mission
Empowering industries and communities to achieve carbon reduction through innovative, cost-effective solutions.
Vision
To be the leading partner for sustainable industrial transformation across Asia and beyond.
Values
- Integrity
- Collaboration
- Excellence
- Impact
Turning local waste into global impact.
Where we are
8 Rockwell Drive, Makati City, Metro Manila, Philippines.
Ownership and group
REURASIA is owned by two shareholder groups. ADL Group is the holding company of the founders. Full Advantage Philippines International is a Philippine renewable-energy developer with its own portfolio of solar, biomass and waste-to-energy projects.
Full Advantage's portfolio gives REURASIA a pipeline of projects to engineer, build and operate, and a team that has taken biomass plants in the Philippines from permit to commissioning, including GIFT in Nueva Ecija and HGEC in Bulacan. Several of these projects are open to co-development or investment; enquiries go to the contact page.
Ten years
- 2016
Founded in Makati by Maxime Droit and Carla Abesamis, from the AREVA Bioenergy team. GIFT 12 MWe, delivered by that team in 2015 and 2016, supported from the first year to 2020.
- 2019
HDJ Bayawan 3 MWe bagasse cogeneration: equipment supply, installation and commissioning begin.
- 2020
Subsidiaries opened in France and India. Belgrade 40 MWe alternator factory test witnessed for CNIM Martin.
- 2022
Nationwide waste-to-energy potential study for the Department of Energy.
- 2024
Boiler audits at six Knauf plants across Asia. Power Trend conference.
- 2025
New office inaugurated in Makati. BECIS 18 TPH biomass boiler O&M begins at Cabuyao.
- 2026
Biosfair digester listed in the Gold Standard Impact Registry with atmosfair. Ten years.
Fifty references: named clients, scopes and dates.
See the referencesTell us about your site
What the site produces, what you pay to dispose of it, and what you pay for energy. An engineer reads it and comes back with the first step.