REURASIAManagement Corporation

Who we work with

These sectors produce organic waste or burn fuel, and buy energy. What differs is the feedstock, the season and the site, so the first step differs too.

Four kinds of client come to us: foreign developers entering the Philippines, multinational factories cutting Scope 1, international partners needing a Philippine engineering bridge, and owners of waste or biomass.

  • Private landfills and waste operators

    Airspace is the asset, and the organic fraction consumes it fastest. The same fraction drives the odour, the leachate load and the community pressure that make each expansion permit harder than the last.

  • Rice mills

    Husk, bran and effluent on one side; power and heat bills on the other. Reliability matters more than any technology pitch, because downtime in season cannot be recovered.

  • Sugar mills and distilleries

    Press mud, filter cake and vinasse are a compliance load and a disposal cost. Bagasse already fires the boilers, but the surplus is often wasted, and the season makes every investment decision harder than it looks.

  • Food processors and industrial plants

    A steady stream of organic waste costs money to dispose of, beside a utility bill that keeps rising. There is no appetite for a large capital project to fix either, and no space in the operating budget for one.

  • Poultry and livestock farms

    Manure and litter handling, odour, flies, neighbours and wastewater, all at once. Biosecurity rules make every waste movement a risk decision, so the waste tends to stay where it is.

  • Manufacturing plants with fuel-fired boilers

    The fuel bill for the boiler is usually larger than the electricity bill, and it is the one nobody has modelled. The group has a Scope 1 target. The plant has a production schedule. The two meet at the boiler.

  • Developers and technology providers

    A pipeline or a technology needs Philippine execution: sites, permits, construction and an operator who is still there years after commissioning. The permitting path runs through the DOE, ERC, DENR, BOI and NGCP, and each has its own clock.

Tell us about your site

What the site produces, what you pay to dispose of it, and what you pay for energy. An engineer reads it and comes back with the first step.