REURASIAManagement Corporation

Food processors and industrial plants in the Philippines

On-site digestion of organic waste under a lease, so disposal cost and energy cost fall without a capital project.

Orient Cement plant, India, December 2020
Orient Cement plant, India, December 2020

The problem

A steady stream of organic waste costs money to dispose of, beside a utility bill that keeps rising.

There is no appetite for a large capital project to fix either, and no space in the operating budget for one.

The hauler's invoice and the power bill sit in different departments, so nobody adds them up.

What usually applies

  • A containerised anaerobic digester on your site under a 10-year lease. We finance, build and operate it; you supply the waste and take the gas or power.
  • Co-digestion where a second stream from a neighbour improves the mix.
  • A paid audit first where the composition is uncertain, so the lease is sized on measured data.

How the digester lease works

What usually does not

  • Sites below about 2,000 tonnes a year of digestible organics, unless the composition is unusually rich. Below that, composting or a shared plant is the honest answer.
  • Packaging, plastics and sweepings. The digester takes the organic fraction only.

A reference from this sector

A digester module being craned onto its foundation
A Biosfair digester module craned onto its foundation, San Pablo City, 2026.

Biosfair, San Pablo City, Laguna

Containerised dry-digestion plant, relocatable modules

Modules
garage-type, loaded in rotation for steady gas output
Built
2026, shipped as containers
Contract model
10-year lease, operated by REURASIA
Registered
Gold Standard Impact Registry, GS23708

Read the Biosfair reference

The questions we ask first

  1. 1.What is the organic waste, and how many tonnes a year leave the site?
  2. 2.How consistent is it across the week and the year?
  3. 3.What do you pay the hauler per tonne, and what does the landfill charge?
  4. 4.What is the site's monthly electricity and fuel bill?
  5. 5.Is there 600 square metres of hardstanding with power and water access?

Have these to hand and the first conversation produces a number. Tell us about your site.

Tell us about your site

What the site produces, what you pay to dispose of it, and what you pay for energy. An engineer reads it and comes back with the first step.