12 MWe biomass plant
Study and engineering for a 12 MWe biomass plant, as a 20% owner.
MAFRECO · Philippines · 2016 – present
What we did
Study, engineering — and 20% owner.
All references: the reference list.
Tell us about your site
What the site produces, what you pay to dispose of it, and what you pay for energy. An engineer reads it and comes back with the first step.