12 MWe rice-husk biomass power plant, Bulacan

Full-scope owner’s engineering for an independent power producer’s 12 MWe rice-husk plant: technical specifications, the EPC interface, drawing review, site supervision, drone survey documentation and QA/QC.

Hypergreen Energy Corporation (HGEC) · Balagtas, Bulacan, Philippines · 2018 – 2021

HGEC 12 MWe biomass power plant under construction, Bulacan
HGEC 12 MWe biomass power plant under construction, Bulacan.

What we did

Owner’s engineering, full scope, from permitting through construction.

Scope

Owner’s engineering from permitting through construction: technical specifications, the EPC interface, drawing review, site supervision, drone survey documentation and QA/QC.

Sector: Developers and technology providers. All references: the reference list.

The site, 2018 to 2020

Our own photographs and drone survey shots.

HGEC project site, Bulacan
The site from the air, Balagtas, Bulacan.
HGEC plant under construction
The plant under construction, Bulacan.
HGEC construction site
Construction site, Bulacan.
HGEC power plant under construction
The boiler house going up, Bulacan.

Tell us about your site

What the site produces, what you pay to dispose of it, and what you pay for energy. An engineer reads it and comes back with the first step.