3 MWe bagasse cogeneration plant, Negros Oriental
A bagasse-fired cogeneration plant at a sugar mill, for a sugar miller and independent power producer, carried through four phases from commissioning support to the grid interconnection.
HDJ Bayawan Agri-Venture · Bayawan, Negros Oriental, Philippines · 2019 – 2024
What we did
Commissioning support and operator training, installation and commissioning, equipment supply, and NGCP interconnection, in four phases.
Scope, in four phases
2019: commissioning support and training of the operators.
2021: installation and commissioning.
2022: equipment supply.
2024: NGCP interconnection of the Phase 1 3 MWe turbine.
Sector: Sugar mills and distilleries. All references: the reference list.
Site visits, 2019 to 2024
Our own photographs from the plant.
Tell us about your site
What the site produces, what you pay to dispose of it, and what you pay for energy. An engineer reads it and comes back with the first step.