+63 917 659 5595 [email protected]
21st Flr Unit B 8 Rockwell, Makati 1210, PH
REURASIA HDJ team achieves major milestone in HDJ Bayawan Agri Venture Corp Project

REURASIA HDJ Team Achieves Major Milestone in HDJ Bayawan Agri Venture Corp Project

REURASIA has been contracted by HDJ Bayawan Agri Venture Corp for the installation and commissioning of the expansion of their existing Bagasse Fired Cogeneration. The team hit a major milestone for steam drum lifting just 49 days after mobilization

REURASIA HDJ team achieves major milestone in HDJ Bayawan Agri Venture Corp Project REURASIA HDJ team achieves major milestone in HDJ Bayawan Agri Venture Corp Project

The project will use the bagasse produced by the mill to produce 3MW elec and recycle the steam extracted from the steam turbine to the sugar crystallization process.

Not only this process will valorise the waste generated by the sugar process but it will inject 2MWe of green energy into the grid and reduce the cost of fabrication of sugar.

This, among other projects of REURASIA is in line with the company’s efforts to push for better ways of producing power and sustaining the communities around the Philippines

Send Comment

Reurasia
Subscribe